国产无套精品一区二区I久久伊人99I不卡一二区I麻豆精品在线视频I欧美日本中文I中文字幕天天操I草莓视频一区二区I婷婷色婷婷I婷婷午夜天I欧洲亚洲女同hdI插插插综合视频Iav免费观看网站I老女人丨91丨九色I好色综合I四虎影院永久地址I欧州一级片I狠狠干干I五十路熟女丰满大屁股I在线观看你懂的网站I极品白嫩丰满少妇无套I欧美猛少妇色xxxx久久久久I国产精品99久久久久久久久久久久I午夜一区二区三区四区Is理论y理论I人妻无码一区二区三区久久99

Hello, welcome to Xuzhou Tenglong Steel Structure Technology Co., Ltd. official website!

Your Current Location:Home > News > COMPANY NEWS

What are the disadvantages of steel structure
release time:2019/4/25 23:42:41      hit count:2290

Quality problem in steel structure engineering

(I) complexity

The complexity of construction quality problems of steel structure engineering projects is mainly reflected in the numerous factors causing quality problems and the complicated reasons. Even if the quality problems of the same nature are caused by different reasons, the analysis, judgment and treatment of quality problems increase the complexity. For example, welding cracks can occur in both the weld metal and the base metal heat effect, both on the surface of the weld and inside the weld. The crack trend can be parallel to the weld bead or perpendicular to the weld bead. Causes also have improper selection of welding materials and welding preheating or improper heat after the points.

(ii) severity

The severity of construction quality problems of steel structure engineering projects is shown in the following aspects: general, affecting the smooth progress of construction, causing construction delays, increasing costs, serious, building collapse, causing casualties, property damage, and causing adverse social impact.

(3) variability

The quality of steel structure engineering construction will continue to develop and change with the change of the outside world and the extension of time. For example, changes in stress in the welds of steel components cause cracks in welds that were previously free of cracks: delayed cracks can be generated by the activity of hydrogen in the welds after welding. If the members bear overload for a long time, then the steel members to produce under arch bending deformation, hidden dangers.

(iv) frequent occurrence

Since modern buildings in China are dominated by concrete structures, the management personnel and technical personnel engaged in construction are relatively unfamiliar with the production and construction technology of steel structures, and the concrete construction personnel mainly composed of migrant workers do not understand the scientific construction methods of steel structure engineering, which leads to frequent accidents in the construction process.

Steel structures are subject to corrosion

Steel structure must pay attention to protection, especially thin-walled members, therefore, in the more corrosive medium of the building should not use steel structure. The steel structure shall be thoroughly derusted before painting, and the paint quality and coating thickness shall meet the requirements of relevant specifications. In the design, the structure should be protected from damp and rain, and the dead Angle for inspection and maintenance should be avoided as far as possible. Newly built steel structures are usually repainted at regular intervals, with high maintenance costs. Various kinds of high performance coatings and weathering steels are being developed at home and abroad. The problem of poor corrosion resistance of steel structures is expected to be solved.

The steel structure is heat resistant and refractory

The temperature over 250 ℃, the material quality, great changes have taken place not only strength gradually reduce, also blue and creep phenomenon happens. The temperature of 600 ℃, the steel into the plastic state cannot continue to load, strength of steel is almost zero.

Fracture of steel structure

Brittle fracture of steel structures at low temperature and under certain conditions, as well as lamellar tearing of thick plates, should be paid special attention to by designers.

Steel is more expensive

After the adoption of steel structure, the construction cost will increase slightly, which often affects the choice of owners. In fact, the cost of the superstructure accounts for a small proportion of the total project investment, with an increase of about 10%. High-rise buildings, for example, increased by less than 2%. Obviously, the single factor of structure cost should not be used as the basis of deciding which material to use. If all kinds of factors are considered, especially the advantage of time limit, steel structure will be paid more and more attention.


News you are interested in
Previous:What are the advantages of steel structure
Next:Installation of steel structure

Back to list

主站蜘蛛池模板: 剑川县| 佛冈县| 桐乡市| 新蔡县| 揭东县| 泰和县| 怀仁县| 定边县| 沂源县| 赤城县| 沙田区| 宿松县| 叙永县| 敖汉旗| 萍乡市| 黄浦区| 福贡县| 东平县| 柳河县| 邹平县| 陆川县| 德安县| 凉城县| 专栏| 衡阳市| 贵溪市| 宁晋县| 延川县| 天峨县| 库伦旗| 长岛县| 凯里市| 包头市| 东兰县| 鹤庆县| 达州市| 建宁县| 新宾| 凯里市| 辽源市| 栾城县|